Dubai Operations

Infrastructure

Roads, drainage, sewerage and light rail, civil works at city scale, from the Yas Marina Circuit to the Al Sufouh tram.

Portfolio Records

Dubai Operations

  • Yas Island Formula 1 Track

    Civil Works, Abu Dhabi

    Yas Island Formula 1 Track

    Major civil works and track upgrades completed between meetings, ready to host the Formula 1. The full circuit length is 5.554 km and can be configured in five different ways. Yas Marina Circuit is…

    Duration

    1 year

  • Al Rahba City

    Construction of Internal Roads and Services, Abu Dhabi

    Al Rahba City

    Construction of the internal roads and drainage under a civil works contract for this large-scale satellite city in Abu Dhabi. Timing and prompt execution were the main criteria, and were performed within time.

    Duration

    1.8 years

  • Al Barsha South Sewage & Drainage, Phase 1

    Sewage and Drainage System, Dubai

    Al Barsha South Sewage & Drainage, Phase 1

    Extensive upgrading of the civil works and infrastructure to allow major residential construction in the area to utilise the new subsystems. A major civil works project delivered with minimal disruption to existing residences and…

    Duration

    2 years

  • Al Sufouh Light Rail Project

    Metro Civil Works, Dubai

    Al Sufouh Light Rail Project

    The Dubai Tram, formerly the Al Sufouh Tram Project, is a 14.6 km route mainly following Al Sufouh Road, linking Madinat Jumeirah and the Mall of the Emirates with Dubai Marina and Jumeirah Beach…

    Duration

    2.5 years

  • Access to Bluewaters Island

    Overpass and Roadworks, Dubai

    Access to Bluewaters Island

    Major entry road, internal roads and bridge to this man-made island. Coping with access issues from the mainland, all materials were handled manually to allow completion of the project.

    Duration

    1 year

Enquire About Our Dubai Portfolio

Our Dubai office is available for private consultation on institutional-grade civil works and development.